Pigtails
hat.
72Sts
1-6:
K1, p1; to end. Rib.
Start
pattern.
1:
P3, (k6, p4,) to last 9sts, k6, p3.
2:
K3, (p6, k4) to last 9sts, p6, k3.
3-4:
As rows 1-2.
5:
P3,
(c6f, p4) Repeat to last 9sts,
c6f, p3.
6:
K3,
(p6, k4) to last 9sts,
p6, k3.
7:
P3, k6, p4, k6, p2; turn work.
8:
K2, p6, k4, p6, k3; turn work.
9:
P3, k6, p4, k6, p2; turn work.
10:
K2, p6, k4, p6, k3; turn work.
11:
P3, k6, p4, k6, p2; turn work.
12:
K2, p6, k4, p6, k3; turn work.
13:
P3, c6f, p4, c6f, p2;
turn work.
14:
K2, p6, k4, p6, k3; turn work.
15:
P3, k6, p4, k6, p2; turn work.
16:
K2, p6, k4, p6, k3. Break
yarn. Leave sts on spare needle.
Join
yarn to work center sts:
7:
P2, k6, p4, k6, p4, k6, p2; turn
work.
8:
K2, p6, k4, p6, k4, p6, k2; turn work.
9:
P2, k6, p4, k6, p4, k6, p2; turn work.
10:
K2, p6, k4, p6, k4, p6, k2; turn work.
11:
P2, k6, p4, k6, p4, k6, p2; turn work.
12:
K2, p6, k4, p6, k4, p6, k2; turn
work.
13:
P2, c6f, p4, c6f, p4, c6f, p2; turn
work.
14:
K2, p6, k4, p6, k4, p6, k2.; turn
work.
15:
P2, k6, p4, k6,
p4, k6, p2;
turn work.
16:
K2, p6, k4, p6, k4, p6, k2.
Break
yarn and attach to work last 21sts.
7:
P2,
k6, p4, k6, p3.
8:
K3,
p6, k4, p6, k2.
9:
P2, k6, p4, k6,
p3.
10:
K3, p6, k4, p6,
k2.
11:
P2,
k6, p4, k6, p3.
12:
K3,
p6, k4, p6, k2.
13:
P2,
c6f, p4, c6f, p3.
14:
K3,
p6, k4, p6, k2.
15:
P2,
k6, p4, k6, p3.
16:
K3,
p6, k4, p6, k2;
break yarn.
Start
working on all sts once more.
17-20:
As rows 1-2.
21-22:
As rows 5-6.
23:
P1, (p2tog, p2, k6), repeat to last 3 sts,
p2tog, k1. (58sts)
24:
P1, k1, p6,(k2, p6) repeat to last 2sts, k2.
25:(P2,
ssk, k2, k2tog) repeat to last 2sts, p2.(44sts)
26:
(K2, p4) repeat to last 2sts, k2.
27:(P2tog,
ssk, k2tog) repeat to last 2sts,
p2tog. (22sts)
28:
(K1, p2)
repeat to last st, k1.
29:
(P1, ssk,) repeat to last st, p1. (15sts)
30:
P2tog to last st, p1.(8sts)
Break
yarn and pass through remaining sts, sew seam. Weave in yarn
ends.
Scarf.
Cast
on 20sts.
Knit
4 rows.
1:
K4, p3, k6, p3, k4.
2:
K7, p6, k7.
3-4:
as rows 1-2.
5:
K4, p3, c6f, p3, k4.
6:
K7, p6, k7.
7-12:
as rows 1-2.
13-14:
as rows 5-6.
Repeat
rows 7-14 until there are 26 cable crosses or till desired length.
Next
rows:
Repeat
rows 1-4.
Knit
4 rows. Bind off and weave in yarn ends.
Mittens.
Cast
on 22sts.
1-3:
K1, p1, rib.
4-7:
Knit.
8:
Knit 10, knit 2tog, yo, k10.
9-12:
Knit.
13-15:
K1, p1, rib.
Bind
off in rib.
Make
other mitten the same except for row 8:
8:
Knit 10, yo, knit 2tog, k10.
Sew
seams and weave in yarn ends.
Notions:
20g
Fingering weight
yarn. Super
Ketty for Gotz version. Light fingering for Les Cheries version.
Needles:
US 2.5
3
mm.
(or
those you need to obtain gauge) for Gotz.
2.5mm needles for Les Cheries version.
Darning
needle.
Gauge:
7
sts
x
9
rows
= 1 inch. In
stockinette
stitch for Gotz. (8/11 smaller version
)
Abbreviations:
Co:
cast on.
Bo:
bind off.
K:
knit
P:
purl
St-stitch:
Sts- stitches
K2
tog: Knit two stitches together as one stitch.
Ssk:
Slip, slip, knit, slip 2 stitches and knit them together.
Yo:
yarn over
c6f:
slip 3sts on cable needle and hold at front, k3sts and then 3sts from
cable needle.
No comments:
Post a Comment